Plumbing ~ 2nd Rough-in
Southern DataStream, Inc.

Previous Home Next

100_5345

Ready for tub. Two boards are cut and attached to the wall to support the tub. The tub drain pipe is routed to facilitate installation of the remaining tub drainage piping. This pipe is cleaned with a primer then glued into place.