Frame Walls
Southern DataStream, Inc.
bottom of page

Click on thumbnail to view larger picture and obtain more detailed explanation.

page 1 of 2 Next
100_5000 100_5002 100_5004 100_5008 100_5010
Ready for framing Material Air and power Tools Tuff-R
100_5014 100_5016 100_5018 100_5020 100_5022
Blueprints Assembly area Cutting area First wall Tight fit
100_5024 100_5026 100_5028 100_5032 100_5042
Plumb Small adjustments Larger adjustments Nailed Sawzall
100_5044 100_5046 100_5048 100_5050 100_5052
Hurricane straps Masonry anchors Hammer drill Extra washer Clean of dust
100_5054 100_5058 100_5062 100_5066 100_5072
Properly sized Larger sleeve-all Impact wrench Properly set Top plate
100_5074 100_5080 100_5082 100_5084 100_5086
Bottom side wall Header Plywood 2 x 10 Impulse nailer
100_5088 100_6666 100_6678 100_6680 100_6689
Hurricane straps Laying out walls Marked on floor Recessed shower 2 x 6
100_6723 100_6724 100_6725 100_6740 100_6742
Wood laid out Measurements Door openings Location of studs Studs nailed at top
100_6744 100_6745 100_6746 100_6749 100_6750
Assembled Raised Moved into place Framed recessed shower Leveled and nailed
100_6751 100_6752 100_6753 100_6755 100_6762
Protrusions Nailed to floor Pneumatic coil nailer Gang valve Bracing

top of page
This webpage created by SDS intern Joni DuFresne